{"id":2137,"date":"2026-05-05T08:40:54","date_gmt":"2026-05-05T08:40:54","guid":{"rendered":"https:\/\/korev.ae\/uat\/?post_type=project&#038;p=2137"},"modified":"2026-05-11T06:35:08","modified_gmt":"2026-05-11T06:35:08","slug":"construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road","status":"publish","type":"project","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/","title":{"rendered":"Construction of Dualization of Mugharaq Port &#8211; Jabel Al\u00a0 Dhannah Road"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Construction of a 7.5 km dual carriageway road from Al Mugharaq Port to Jebel Al Dhannah in Al Dhafra Region, including full road widening, infrastructure development, utility protection, stormwater systems, street lighting, and traffic management works to improve traffic flow, safety, and connectivity.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Detailed Project Scope<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">This project involves the dualization of the existing single carriageway road into a modern dual carriageway connecting Al Mugharaq Port to Jebel Al Dhannah Road in the Al Dhafra Region. The total project length is approximately 7.5 km and is designed to enhance traffic capacity, improve road safety, and increase operational efficiency.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Scope of Work<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project includes comprehensive road and infrastructure works covering the following components:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Road Works<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Conversion of the existing single carriageway into a dual carriageway (2 lanes in each direction with a central median).<\/li>\n\n\n\n<li>Road widening and construction of new asphalt lanes.<\/li>\n\n\n\n<li>Reconstruction, rehabilitation, and overlay of the existing pavement.<\/li>\n\n\n\n<li>Construction of embankments and slope protection works.<\/li>\n\n\n\n<li>Installation of road markings, traffic signs, and road safety barriers.<\/li>\n\n\n\n<li>Construction of bus lay-bys and installation of bus shelters.<\/li>\n\n\n\n<li>Demolition and reconstruction of selected sections of the existing road.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">2. Stormwater &amp; Drainage Works<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction of surface stormwater drainage systems.<\/li>\n\n\n\n<li>Installation of drainage pipelines, manholes, soakaways, and associated drainage structures.<\/li>\n\n\n\n<li>Culvert extensions and hydraulic capacity improvements.<\/li>\n\n\n\n<li>Protection works to manage and control high groundwater levels.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">3. Street Lighting Works<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Installation of a complete street lighting network.<\/li>\n\n\n\n<li>Supply and installation of LED lighting systems with future smart-control capability.<\/li>\n\n\n\n<li>Installation of lighting poles, cables, ducts, and control cabinets.<\/li>\n\n\n\n<li>Removal, relocation, and reuse of existing lighting infrastructure where applicable.<\/li>\n\n\n\n<li>Testing, commissioning, and energization of the lighting system.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">4. Utility Protection &amp; Relocation Works<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The project includes the protection and relocation of existing utilities, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Electrical utilities (ADDC \/ TRANSCO).<\/li>\n\n\n\n<li>Telecommunication networks (Etisalat \/ DU).<\/li>\n\n\n\n<li>Oil and gas pipelines (ADNOC).<\/li>\n\n\n\n<li>Water pipelines and other utility services.<\/li>\n\n\n\n<li>Trial trenching and verification of existing utility locations.<\/li>\n\n\n\n<li>Coordination with all relevant authorities to obtain approvals and NOCs.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">5. Traffic Management Works<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Preparation and implementation of traffic diversion plans.<\/li>\n\n\n\n<li>Coordination with Abu Dhabi Police and the Integrated Transport Centre (ITC).<\/li>\n\n\n\n<li>Temporary traffic arrangements to maintain continuous road access during construction.<\/li>\n\n\n\n<li>Compliance with Road Safety Audit (Stage 3) requirements.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">6. Landscape &amp; Streetscape Works<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Landscaping and beautification of roundabouts and road corridors.<\/li>\n\n\n\n<li>Installation of hardscape elements including kerbs, interlocks, paving, gravel, and related features.<\/li>\n\n\n\n<li>Coordination of landscape works with infrastructure and utility layouts.<\/li>\n<\/ul>\n","protected":false},"featured_media":2138,"parent":0,"template":"","meta":{"_acf_changed":true},"project-category":[13],"class_list":["post-2137","project","type-project","status-publish","has-post-thumbnail","hentry","project-category-on-going-projects"],"acf":{"district":"Al Dhafra","district_source":{"label":"District","type":"text","formatted_value":"Al Dhafra"},"location":"","location_source":{"label":"Location","type":"wysiwyg","formatted_value":""},"project__development":"","project__development_source":{"label":"Project \/ Development","type":"wysiwyg","formatted_value":""},"project_gallery":[2206,2207,2208,2209,2210,2211,2212,2213,2214,2215,2216,2217,2218,2219,2220,2221,2222,2223,2224,2225,2226,2227,2228,2229,2230,2231,2232,2233,2234],"project_gallery_source":{"label":"Project Gallery","type":"gallery","formatted_value":[{"ID":2206,"id":2206,"title":"Picture25","filename":"Picture25.jpg","filesize":91188,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture25.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture25\/","alt":"","author":"2","description":"","caption":"","name":"picture25","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:26:55","modified":"2026-05-11 06:26:55","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":653,"height":490,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture25-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture25-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture25.jpg","medium_large-width":653,"medium_large-height":490,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture25.jpg","large-width":653,"large-height":490,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture25.jpg","1536x1536-width":653,"1536x1536-height":490,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture25.jpg","2048x2048-width":653,"2048x2048-height":490}},{"ID":2207,"id":2207,"title":"Picture26","filename":"Picture26.jpg","filesize":59354,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture26.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture26\/","alt":"","author":"2","description":"","caption":"","name":"picture26","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:27:07","modified":"2026-05-11 06:27:07","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":719,"height":490,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture26-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture26-300x204.jpg","medium-width":300,"medium-height":204,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture26.jpg","medium_large-width":719,"medium_large-height":490,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture26.jpg","large-width":719,"large-height":490,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture26.jpg","1536x1536-width":719,"1536x1536-height":490,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture26.jpg","2048x2048-width":719,"2048x2048-height":490}},{"ID":2208,"id":2208,"title":"Picture27","filename":"Picture27.jpg","filesize":77831,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture27.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture27\/","alt":"","author":"2","description":"","caption":"","name":"picture27","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:27:18","modified":"2026-05-11 06:27:18","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":653,"height":490,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture27-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture27-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture27.jpg","medium_large-width":653,"medium_large-height":490,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture27.jpg","large-width":653,"large-height":490,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture27.jpg","1536x1536-width":653,"1536x1536-height":490,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture27.jpg","2048x2048-width":653,"2048x2048-height":490}},{"ID":2209,"id":2209,"title":"Picture28","filename":"Picture28.jpg","filesize":56236,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture28.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture28\/","alt":"","author":"2","description":"","caption":"","name":"picture28","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:27:29","modified":"2026-05-11 06:27:29","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":638,"height":480,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture28-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture28-300x226.jpg","medium-width":300,"medium-height":226,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture28.jpg","medium_large-width":638,"medium_large-height":480,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture28.jpg","large-width":638,"large-height":480,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture28.jpg","1536x1536-width":638,"1536x1536-height":480,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture28.jpg","2048x2048-width":638,"2048x2048-height":480}},{"ID":2210,"id":2210,"title":"pic1","filename":"pic1-1.jpg","filesize":63499,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/pic1-1.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/pic1-2\/","alt":"","author":"2","description":"","caption":"","name":"pic1-2","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:27:40","modified":"2026-05-11 06:27:40","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":653,"height":490,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/pic1-1-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/pic1-1-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/pic1-1.jpg","medium_large-width":653,"medium_large-height":490,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/pic1-1.jpg","large-width":653,"large-height":490,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/pic1-1.jpg","1536x1536-width":653,"1536x1536-height":490,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/pic1-1.jpg","2048x2048-width":653,"2048x2048-height":490}},{"ID":2211,"id":2211,"title":"Picture1","filename":"Picture1.jpg","filesize":66138,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture1.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture1-3\/","alt":"","author":"2","description":"","caption":"","name":"picture1-3","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:27:51","modified":"2026-05-11 06:27:51","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":734,"height":485,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture1-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture1-300x198.jpg","medium-width":300,"medium-height":198,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture1.jpg","medium_large-width":734,"medium_large-height":485,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture1.jpg","large-width":734,"large-height":485,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture1.jpg","1536x1536-width":734,"1536x1536-height":485,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture1.jpg","2048x2048-width":734,"2048x2048-height":485}},{"ID":2212,"id":2212,"title":"Picture2","filename":"Picture2.jpg","filesize":61902,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture2.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture2-2\/","alt":"","author":"2","description":"","caption":"","name":"picture2-2","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:28:02","modified":"2026-05-11 06:28:02","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":653,"height":490,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture2-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture2-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture2.jpg","medium_large-width":653,"medium_large-height":490,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture2.jpg","large-width":653,"large-height":490,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture2.jpg","1536x1536-width":653,"1536x1536-height":490,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture2.jpg","2048x2048-width":653,"2048x2048-height":490}},{"ID":2213,"id":2213,"title":"Picture3","filename":"Picture3.jpg","filesize":72295,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture3.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture3-3\/","alt":"","author":"2","description":"","caption":"","name":"picture3-3","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:28:13","modified":"2026-05-11 06:28:13","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":664,"height":498,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture3-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture3-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture3.jpg","medium_large-width":664,"medium_large-height":498,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture3.jpg","large-width":664,"large-height":498,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture3.jpg","1536x1536-width":664,"1536x1536-height":498,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture3.jpg","2048x2048-width":664,"2048x2048-height":498}},{"ID":2214,"id":2214,"title":"Picture4","filename":"Picture4.jpg","filesize":100897,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture4.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture4-3\/","alt":"","author":"2","description":"","caption":"","name":"picture4-3","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:28:24","modified":"2026-05-11 06:28:24","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":667,"height":501,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture4-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture4-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture4.jpg","medium_large-width":667,"medium_large-height":501,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture4.jpg","large-width":667,"large-height":501,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture4.jpg","1536x1536-width":667,"1536x1536-height":501,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture4.jpg","2048x2048-width":667,"2048x2048-height":501}},{"ID":2215,"id":2215,"title":"Picture5","filename":"Picture5.jpg","filesize":92402,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture5.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture5-3\/","alt":"","author":"2","description":"","caption":"","name":"picture5-3","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:28:35","modified":"2026-05-11 06:28:35","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":640,"height":480,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture5-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture5-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture5.jpg","medium_large-width":640,"medium_large-height":480,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture5.jpg","large-width":640,"large-height":480,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture5.jpg","1536x1536-width":640,"1536x1536-height":480,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture5.jpg","2048x2048-width":640,"2048x2048-height":480}},{"ID":2216,"id":2216,"title":"Picture6","filename":"Picture6.jpg","filesize":64513,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture6.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture6-3\/","alt":"","author":"2","description":"","caption":"","name":"picture6-3","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:28:46","modified":"2026-05-11 06:28:46","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":644,"height":485,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture6-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture6-300x226.jpg","medium-width":300,"medium-height":226,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture6.jpg","medium_large-width":644,"medium_large-height":485,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture6.jpg","large-width":644,"large-height":485,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture6.jpg","1536x1536-width":644,"1536x1536-height":485,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture6.jpg","2048x2048-width":644,"2048x2048-height":485}},{"ID":2217,"id":2217,"title":"Picture7","filename":"Picture7.jpg","filesize":85976,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture7.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture7-3\/","alt":"","author":"2","description":"","caption":"","name":"picture7-3","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:28:57","modified":"2026-05-11 06:28:57","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":675,"height":488,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture7-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture7-300x217.jpg","medium-width":300,"medium-height":217,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture7.jpg","medium_large-width":675,"medium_large-height":488,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture7.jpg","large-width":675,"large-height":488,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture7.jpg","1536x1536-width":675,"1536x1536-height":488,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture7.jpg","2048x2048-width":675,"2048x2048-height":488}},{"ID":2218,"id":2218,"title":"Picture8","filename":"Picture8.jpg","filesize":78117,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture8.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture8-3\/","alt":"","author":"2","description":"","caption":"","name":"picture8-3","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:29:08","modified":"2026-05-11 06:29:08","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":661,"height":496,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture8-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture8-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture8.jpg","medium_large-width":661,"medium_large-height":496,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture8.jpg","large-width":661,"large-height":496,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture8.jpg","1536x1536-width":661,"1536x1536-height":496,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture8.jpg","2048x2048-width":661,"2048x2048-height":496}},{"ID":2219,"id":2219,"title":"Picture9","filename":"Picture9.jpg","filesize":73076,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture9.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture9-3\/","alt":"","author":"2","description":"","caption":"","name":"picture9-3","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:29:19","modified":"2026-05-11 06:29:19","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":743,"height":490,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture9-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture9-300x198.jpg","medium-width":300,"medium-height":198,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture9.jpg","medium_large-width":743,"medium_large-height":490,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture9.jpg","large-width":743,"large-height":490,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture9.jpg","1536x1536-width":743,"1536x1536-height":490,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture9.jpg","2048x2048-width":743,"2048x2048-height":490}},{"ID":2220,"id":2220,"title":"Picture10","filename":"Picture10.jpg","filesize":45946,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture10.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture10-3\/","alt":"","author":"2","description":"","caption":"","name":"picture10-3","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:29:30","modified":"2026-05-11 06:29:30","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":653,"height":490,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture10-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture10-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture10.jpg","medium_large-width":653,"medium_large-height":490,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture10.jpg","large-width":653,"large-height":490,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture10.jpg","1536x1536-width":653,"1536x1536-height":490,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture10.jpg","2048x2048-width":653,"2048x2048-height":490}},{"ID":2221,"id":2221,"title":"Picture11","filename":"Picture11.jpg","filesize":59511,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture11.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture11-2\/","alt":"","author":"2","description":"","caption":"","name":"picture11-2","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:29:41","modified":"2026-05-11 06:29:41","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":684,"height":485,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture11-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture11-300x213.jpg","medium-width":300,"medium-height":213,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture11.jpg","medium_large-width":684,"medium_large-height":485,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture11.jpg","large-width":684,"large-height":485,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture11.jpg","1536x1536-width":684,"1536x1536-height":485,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture11.jpg","2048x2048-width":684,"2048x2048-height":485}},{"ID":2222,"id":2222,"title":"Picture12","filename":"Picture12.jpg","filesize":80331,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture12.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture12-3\/","alt":"","author":"2","description":"","caption":"","name":"picture12-3","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:29:52","modified":"2026-05-11 06:29:52","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":646,"height":485,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture12-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture12-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture12.jpg","medium_large-width":646,"medium_large-height":485,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture12.jpg","large-width":646,"large-height":485,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture12.jpg","1536x1536-width":646,"1536x1536-height":485,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture12.jpg","2048x2048-width":646,"2048x2048-height":485}},{"ID":2223,"id":2223,"title":"Picture13","filename":"Picture13.jpg","filesize":67608,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture13.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture13-2\/","alt":"","author":"2","description":"","caption":"","name":"picture13-2","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:30:03","modified":"2026-05-11 06:30:03","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":703,"height":490,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture13-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture13-300x209.jpg","medium-width":300,"medium-height":209,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture13.jpg","medium_large-width":703,"medium_large-height":490,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture13.jpg","large-width":703,"large-height":490,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture13.jpg","1536x1536-width":703,"1536x1536-height":490,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture13.jpg","2048x2048-width":703,"2048x2048-height":490}},{"ID":2224,"id":2224,"title":"Picture14","filename":"Picture14.jpg","filesize":64326,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture14.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture14-2\/","alt":"","author":"2","description":"","caption":"","name":"picture14-2","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:30:14","modified":"2026-05-11 06:30:14","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":646,"height":485,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture14-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture14-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture14.jpg","medium_large-width":646,"medium_large-height":485,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture14.jpg","large-width":646,"large-height":485,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture14.jpg","1536x1536-width":646,"1536x1536-height":485,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture14.jpg","2048x2048-width":646,"2048x2048-height":485}},{"ID":2225,"id":2225,"title":"Picture15","filename":"Picture15.jpg","filesize":73300,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture15.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture15-2\/","alt":"","author":"2","description":"","caption":"","name":"picture15-2","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:30:25","modified":"2026-05-11 06:30:25","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":640,"height":480,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture15-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture15-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture15.jpg","medium_large-width":640,"medium_large-height":480,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture15.jpg","large-width":640,"large-height":480,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture15.jpg","1536x1536-width":640,"1536x1536-height":480,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture15.jpg","2048x2048-width":640,"2048x2048-height":480}},{"ID":2226,"id":2226,"title":"Picture16","filename":"Picture16.jpg","filesize":43062,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture16.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture16-3\/","alt":"","author":"2","description":"","caption":"","name":"picture16-3","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:30:37","modified":"2026-05-11 06:30:37","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":692,"height":490,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture16-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture16-300x212.jpg","medium-width":300,"medium-height":212,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture16.jpg","medium_large-width":692,"medium_large-height":490,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture16.jpg","large-width":692,"large-height":490,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture16.jpg","1536x1536-width":692,"1536x1536-height":490,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture16.jpg","2048x2048-width":692,"2048x2048-height":490}},{"ID":2227,"id":2227,"title":"Picture17","filename":"Picture17.jpg","filesize":100139,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture17.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture17-3\/","alt":"","author":"2","description":"","caption":"","name":"picture17-3","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:30:48","modified":"2026-05-11 06:30:48","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":646,"height":485,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture17-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture17-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture17.jpg","medium_large-width":646,"medium_large-height":485,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture17.jpg","large-width":646,"large-height":485,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture17.jpg","1536x1536-width":646,"1536x1536-height":485,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture17.jpg","2048x2048-width":646,"2048x2048-height":485}},{"ID":2228,"id":2228,"title":"Picture18","filename":"Picture18.jpg","filesize":87560,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture18.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture18-3\/","alt":"","author":"2","description":"","caption":"","name":"picture18-3","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:30:59","modified":"2026-05-11 06:30:59","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":660,"height":496,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture18-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture18-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture18.jpg","medium_large-width":660,"medium_large-height":496,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture18.jpg","large-width":660,"large-height":496,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture18.jpg","1536x1536-width":660,"1536x1536-height":496,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture18.jpg","2048x2048-width":660,"2048x2048-height":496}},{"ID":2229,"id":2229,"title":"Picture19","filename":"Picture19.jpg","filesize":77815,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture19.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture19-2\/","alt":"","author":"2","description":"","caption":"","name":"picture19-2","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:31:11","modified":"2026-05-11 06:31:11","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":640,"height":480,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture19-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture19-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture19.jpg","medium_large-width":640,"medium_large-height":480,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture19.jpg","large-width":640,"large-height":480,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture19.jpg","1536x1536-width":640,"1536x1536-height":480,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture19.jpg","2048x2048-width":640,"2048x2048-height":480}},{"ID":2230,"id":2230,"title":"Picture20","filename":"Picture20.jpg","filesize":79281,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture20.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture20-2\/","alt":"","author":"2","description":"","caption":"","name":"picture20-2","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:31:22","modified":"2026-05-11 06:31:22","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":647,"height":485,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture20-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture20-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture20.jpg","medium_large-width":647,"medium_large-height":485,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture20.jpg","large-width":647,"large-height":485,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture20.jpg","1536x1536-width":647,"1536x1536-height":485,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture20.jpg","2048x2048-width":647,"2048x2048-height":485}},{"ID":2231,"id":2231,"title":"Picture21","filename":"Picture21.jpg","filesize":60916,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture21.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture21-2\/","alt":"","author":"2","description":"","caption":"","name":"picture21-2","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:31:33","modified":"2026-05-11 06:31:33","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":653,"height":490,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture21-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture21-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture21.jpg","medium_large-width":653,"medium_large-height":490,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture21.jpg","large-width":653,"large-height":490,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture21.jpg","1536x1536-width":653,"1536x1536-height":490,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture21.jpg","2048x2048-width":653,"2048x2048-height":490}},{"ID":2232,"id":2232,"title":"Picture22","filename":"Picture22.jpg","filesize":66150,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture22.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture22\/","alt":"","author":"2","description":"","caption":"","name":"picture22","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:31:44","modified":"2026-05-11 06:31:44","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":653,"height":490,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture22-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture22-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture22.jpg","medium_large-width":653,"medium_large-height":490,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture22.jpg","large-width":653,"large-height":490,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture22.jpg","1536x1536-width":653,"1536x1536-height":490,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture22.jpg","2048x2048-width":653,"2048x2048-height":490}},{"ID":2233,"id":2233,"title":"Picture23","filename":"Picture23.jpg","filesize":76774,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture23.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture23\/","alt":"","author":"2","description":"","caption":"","name":"picture23","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:31:55","modified":"2026-05-11 06:31:55","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":666,"height":499,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture23-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture23-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture23.jpg","medium_large-width":666,"medium_large-height":499,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture23.jpg","large-width":666,"large-height":499,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture23.jpg","1536x1536-width":666,"1536x1536-height":499,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture23.jpg","2048x2048-width":666,"2048x2048-height":499}},{"ID":2234,"id":2234,"title":"Picture24","filename":"Picture24.jpg","filesize":93010,"url":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture24.jpg","link":"https:\/\/korev.ae\/uat\/blog\/project\/construction-of-dualization-of-mugharaq-port-jabel-al-dhannah-road\/picture24\/","alt":"","author":"2","description":"","caption":"","name":"picture24","status":"inherit","uploaded_to":2137,"date":"2026-05-11 06:32:06","modified":"2026-05-11 06:32:06","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/korev.ae\/uat\/wp-includes\/images\/media\/default.png","width":713,"height":490,"sizes":{"thumbnail":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture24-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture24-300x206.jpg","medium-width":300,"medium-height":206,"medium_large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture24.jpg","medium_large-width":713,"medium_large-height":490,"large":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture24.jpg","large-width":713,"large-height":490,"1536x1536":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture24.jpg","1536x1536-width":713,"1536x1536-height":490,"2048x2048":"https:\/\/korev.ae\/uat\/wp-content\/uploads\/2026\/05\/Picture24.jpg","2048x2048-width":713,"2048x2048-height":490}}]}},"_links":{"self":[{"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/project\/2137","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/types\/project"}],"acf:attachment":[{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2234"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2233"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2232"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2231"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2230"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2229"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2228"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2227"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2226"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2225"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2224"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2223"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2222"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2221"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2220"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2219"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2218"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2217"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2216"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2215"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2214"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2213"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2212"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2211"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2210"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2209"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2208"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2207"},{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2206"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media\/2138"}],"wp:attachment":[{"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/media?parent=2137"}],"wp:term":[{"taxonomy":"project-category","embeddable":true,"href":"https:\/\/korev.ae\/uat\/wp-json\/wp\/v2\/project-category?post=2137"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}